BUILDING MOBIUS

TIGerific!

The new TIG welding gun we have been waiting for several months now finally arrived this week and so Sezgin has been having great fun breaking it in and diving into the backlog of welds that we wanted done with TIG rather than MIG.  Read on to find out what...

Read More
TIGerific!

Stairways to Heaven

The weather has been Cccccccold and wet outside this week with one night time low down to zero Celsius but still lots of hot progress inside.  Most exciting of which is that little Yiğit and Mert, the new Dinç twins are now home!  Dinçer kindly shared...

Read More
Stairways to Heaven

Just About Topped Off November 26-30, 2018

Not quite as “moving” or dramatic of a week this time after the flurry of activity moving Möbius and Legacy from the original Naval Yachts boatyard to the new one so this post will be much shorter for you.  If you have been following along with our blog for...

Read More
Just About Topped Off  November 26-30, 2018

Topping The Tank Tops – Nov. 12-16 2018

While I spent this past week up in Amsterdam walking the miles of aisles of the HUGE METS 2018 Marine Equipment & Trades Show the rest of Team Möbius was hard at work getting the frames for the tank access ports welded to the tank tops and they also started...

Read More
Topping The Tank Tops – Nov. 12-16 2018